Title 24 compliance testing on California's Central Coast

Acceptance testing done right — residential and commercial.

mtestpros.com provides Title 24 field verification and diagnostic testing for both residential and nonresidential projects: ECC (formerly HERS) verification for homes and dwelling units, and mechanical acceptance testing for commercial systems.

Residential ECC (formerly HERS) Testing

Single-family · Additions & alterations · Multifamily

Field verification and diagnostic testing for single-family homes, additions, alterations, and multifamily dwelling units — duct leakage, refrigerant charge, airflow, ventilation, and envelope measures called out on the CF1R.

See residential services →

Nonresidential Acceptance Testing

MCH acceptance · NRCA & NRCI

Mechanical acceptance testing for commercial HVAC systems — outdoor air, economizers, duct leakage, variable flow controls, fault detection, and the NRCA documentation that closes out the project.

See nonresidential services →
New Service

Residential ECC (formerly HERS) Testing

California renamed the Home Energy Rating System (HERS) to Energy Code Compliance (ECC) effective January 1, 2026. The work is the same field verification and diagnostic testing contractors have always needed — only the name and paperwork labels changed. When a project's Certificate of Compliance calls for a verified measure, we test it on site and register the results.

HVAC & Duct Systems

Duct leakage testing, duct location and insulation, return duct design, air filter device design, and low-leakage air handlers.

Cooling & Heat Pumps

Refrigerant charge verification, system airflow, fan efficacy and watt draw, and heat pump capacity including variable capacity systems.

Ventilation

Whole-building mechanical ventilation airflow, kitchen range hood exhaust, and heat and energy recovery ventilators.

Building Envelope

Building air leakage and dwelling unit compartmentalization, Quality Insulation Installation (QII), and spray foam insulation verification.

Water Heating

Pipe insulation, compact hot water distribution, demand recirculation systems, and drain water heat recovery.

Registration & Certificates

Results submitted to the data registry, with the Certificate of Verification (CF3R) issued for permit close-out.

How the paperwork fits together

CF1R Certificate of Compliance — prepared at design, lists which measures require verification.
CF2R Certificate of Installation — completed by the installing contractor for the work performed.
CF3R Certificate of Verification — issued by us after testing, and registered as the compliance record.
Re-test If a measure fails, the contractor corrects it and we retest until it passes.
Commercial

Nonresidential Acceptance Testing

We support owners, contractors, and project teams with mechanical acceptance testing focused on performance, compliance, and confidence — including MCH acceptance tests, NRCA forms, and NRCI documentation support.

Airflow Verification

Confirm supply, return, and exhaust airflow performance.

Equipment Startup Review

Check operation of RTUs, split systems, heat pumps, and more.

Control Sequence Checks

Verify HVAC controls respond properly during testing.

NRCA Forms

We complete NRCA acceptance documentation for applicable mechanical systems and controls.

NRCI Documentation

We support NRCI certificate documentation for code compliance and project closeout.

Documentation Support

Clear reporting to support project closeout and turnover.

Air-side acceptance tests

MCH-02-AOutdoor air acceptance
MCH-03-AConstant volume single zone HVAC
MCH-04a / 04bAir distribution duct leakage
MCH-05-AAir economizer controls
MCH-06-ADemand control ventilation
MCH-07-ASupply fan variable flow controls
MCH-16-ASupply air temperature reset controls
MCH-19-AOccupancy sensor controls

Hydronic & plant acceptance tests

MCH-08-AValve leakage test
MCH-09-ASupply water temperature reset controls
MCH-10-AHydronic system variable flow controls
MCH-17-ACondenser water temperature reset controls

Controls, fault detection & demand response

MCH-11-AAutomatic demand shed controls
MCH-12-AFault detection & diagnostics for packaged DX units
MCH-13-AFault detection & diagnostics for AHUs and zone terminal units
MCH-18-AEnergy management control systems

Multifamily dwelling tests

MCH-20-A-HMultifamily dwelling inspection acceptance
MCH-20-B-HMultifamily dwelling kitchen exhaust
MCH-20-C-HMultifamily IAQ ventilation system
MCH-20-D-HMultifamily dwelling HRV / ERV
MCH-21-HMultifamily envelope leakage

How a project runs

The same straightforward sequence on residential and commercial work.

STEP 01

Send the plans

Share the CF1R or NRCC and the scope. We confirm which measures require testing.

STEP 02

Schedule the visit

We coordinate with your installer around the stage of construction each test needs.

STEP 03

Test on site

Diagnostic testing and field verification, with results reviewed before we leave.

STEP 04

Register & close out

Certificates registered and documentation delivered for permit sign-off.

Service Area

We serve residential and commercial projects throughout California's Central Coast and surrounding areas.

Santa Barbara County

Santa Barbara, Goleta, Isla Vista, Montecito, Carpinteria, Summerland, Buellton, Solvang, Santa Ynez, Guadalupe, and Santa Maria.

Ventura County

Ventura, Ojai, Oxnard, and Camarillo.

Need testing on your project?

Contact mtestpros.com to discuss your project, timeline, and which measures require verification — residential ECC or nonresidential acceptance testing.

Request testing

Tell us about the project and we'll come back with scheduling and pricing.

Prefer email? Write to [email protected].